top of page

Dozer N215 Practical and Theory test

Dozer Test only : NPORS/CSCS

  • 3 hours 30 minutes
  • 330 British pounds
  • On site or our centre

Service Description

you must supply the machine, on your site. anything out of yorkshire milage applys ACTIVITY GUIDELINES The learner must: Test sequence for practical . There is a theory test element which needs to be completed first along with profile sheet. Complete all pre-start and running checks before any activity takes place ✅The shutdown procedures must only be completed by the learner at the end of the test ✅ All additional test requirements can be completed over the period of the test duration ✅Seat belt must be worn if stated in the employer’s risk assessment / method statement Operator safety and observations ✅The dozer must be serviceable, meets the current legislation and fitted with a standard bucket change to blade The learner must: ✅Travelling to work area ✅Travel up and down a gradient ✅Travel over varying terrain ✅Reverse the dozer in a straight line (min 50m) and through a restriction ✅Prepare and set up the dozer for excavating duties Setting up to excavating Excavating tasks ✅Slot dozer a straight trench and form a stockpile at the end ✅Set blade (if applicable) and push 1 x blade width material from a stockpile and spread ✅Backfill the slot trench and compact area Back fill and work area ✅Clean and level work area Shutdown procedures ✅Dozer parked in a safe position with the engine and isolator key removed and handed to the instructor Additional notes ✅A verbal description to the instructor of the pre-start checks would be acceptable if the machine is hot ✅The operator’s manual must be accessible ✅The slope must be of sufficient incline with manoeuvring room on the top to enable the learner to demonstrate the correct procedures for travelling up and down a gradient as per manufacturers recommendations Specifications ✅There must be sufficient quantity of suitable material ✅The ground to be excavated must be suitable and sufficient for the test ✅The slot trench excavated must be a minimum depth of 1m deep ✅The slot trench excavated must be a minimum 20m in length ✅The material must be evenly spread over an appropriate area ✅The ramp incline must not exceed the max safe working angle specified in the manufacturer’s handbook Test timings ✅The full test must be completed within 2hrs 45min Note ✅It is recommended that all learners completing basic training receive a minimum 7hr Health, Safety, Environment and Induction Training


Cancellation Policy

Cancellation policy: If you need to reschedule your booking within less than seven days' notice, please contact us by phone or email. If we haven't yet ordered any plant for your booking, there will be no additional charge beyond the deposit. However, if we have already ordered plant or arranged for transportation, you may be responsible for those costs you will


Contact Details

07540652477

chris@ctassessments.co.uk

Northlands, Thorpe Lane Wakefield England WF3 1SL United Kingdom


bottom of page