top of page

Excavator 180° [N201]

N201 Excavator 180° on-site testing with your own machine

  • 3 hours 30 minutes
  • 475 British pounds
  • CT assessments & Training LTD

Service Description

ACTIVITY GUIDELINES The learner must: ✅Complete all pre-start and running checks before any activity takes place Test sequence ✅Only complete the shutdown procedures at the end of the test ✅All additional test requirements can be completed in any order The learner must: ✅Travel up and down a gradient ✅Stop and start on the gradient whilst travelling up-hill ✅Stop and start on the gradient whilst travelling down-hill ✅Manoeuvre through a chicane applying the full steering range in both forward and reverse direction ✅Travel over varying terrain Prepare and set up the machine for excavating duties. Setting up to excavate ✅Excavate 4 trenches with the backhoe set at right angles to form a square Excavate trench and load vehicle. ✅The ends must be clean, free of debris, and vertical. ✅Form a spoil heap utilising the multi-purpose bucket ✅Load material on to the vehicle Backfill excavation ✅Backfill and reinstate the excavated area to its original state using both the multipurpose bucket (front) and backhoe Change attachment ✅Remove and attach the bucket Shutdown procedures ✅Excavator parked in a safe position with the engine and isolator key removed and handed to the instructor Additional notes ✅A verbal description to the instructor of the pre-start checks would be acceptable if the machine is hot ✅The operator’s manual must be accessible ✅When the bucket is released from the quick hitch system and the excavator must be moved and repositioned before re-attaching ✅The slope must be of sufficient incline with manoeuvring room on the top to enable the learner to demonstrate the correct procedures for traveling up and down a gradient as per the manufacturer’s recommendations Specifications ✅Trench length will be 6 metres per trench ✅Trench depth must be a minimum of 1 metre ✅The loading vehicle must be filled to capacity ✅The loads placed in the vehicle must be loaded with both front end and backhoe buckets (minimum 2 loads from each) Test Timings ✅The full test must be completed within 2hrs 45mins ✅A verbal description to the instructor of the pre-start checks would be acceptable if the machine is hot ✅The operator’s manual must be accessible ✅When the bucket is released from the quick hitch system and the excavator must be moved and repositioned before re-attaching ✅The slope must be of sufficient incline with manoeuvring room on the top to enable


Cancellation Policy

Cancellation policy: If you need to reschedule your booking within less than seven days' notice, please contact us by phone or email. If we haven't yet ordered any plant for your booking, there will be no additional charge beyond the deposit. However, if we have already ordered plant or arranged for transportation, you may be responsible for those costs you will


Contact Details

  • Northlands, Thorpe Lane Wakefield England WF3 1SL United Kingdom

    07540652477

    chris@ctassessments.co.uk


bottom of page